top of page
Cost vs. Technical Considerations in the RFP
Cost vs. Technical Considerations in the RFP

Thu, Nov 05

|

Zoom

Cost vs. Technical Considerations in the RFP

The City of Houston Public Works and the San Antonio River Authority (River Authority) have both embarked on treatment plant expansions for their first Progressive Design-Build projects. Assembling the Request For Proposals was a challenge.

Registration is Closed
See other events

Time & Location

Nov 05, 2020, 2:00 PM – 3:00 PM CST

Zoom

About the Event

The City of Houston Public Works and the San Antonio River Authority (River Authority) have both embarked on treatment plant expansions for their first Progressive Design-Build projects. Houston will expand the Northeast Water Purification Plant (NEWPP) by 320 million gallons per day (MGD) with an expected cost of $2 billion. The River Authority will expand the Salitrillo Wastewater Treatment Plant to 7.83 MGD with an expected cost of $25 million. 

Assembling the Request For Proposals (RFP) was challenging – finding the precise balance between cost and technical considerations to ensure the best value design builder would be selected while costs are controlled. Methodology for the RFPs and the considerations that were taken during the procurement will be presented. 

Presenters

Erika Anderson, PE, PMP; Rajinder Singh, PE, Associate DBIA, Marisa Vergara-Trevino, PE

Shaping the Future Through Design-Build

The DBIA Southwest Region Annual Conference is the premier conference that brings together practitioners,…

Registration

  • Nonmember Individual Webinar

    $50.00

    +$1.25 ticket service fee

    Sale ended
  • DBIA Member Individual Webinar

    $45.00

    +$1.13 ticket service fee

    Sale ended
  • Owner/Public Entity

    $35.00

    +$0.88 ticket service fee

    Sale ended

Share This Event

bottom of page